Completed vehicle wash bay The re-construction of the Existing Vehicle Wash Bay Facility to DOE Guidelines-with Heavy Duty mesh Grating over existing Steel frame &…
See this project step-by-step…
Description of works: Turnkey Design & Build creation of new Car Receiving & Storage Facility on a runway apron at the former RAF Greenham Common Airforce Base, Berkshire. The…
See this project step-by-step…
Construction & Facility Upgrade works Vanguard Construction were awarded the Contract by competitive Tender for the extensive Construction & Facility Upgrade works at Copart UK’s…
See this project step-by-step…
Vanguard Contracts were asked to carry out Excavation, Concreting & Dredging works at a 10 Acre Site for Copart in Sandwich. Description of works: 2000 m²…
See this project step-by-step…
Copart-Wombourne, Wolverhampton Copart UK specialises in the remarketing of around 250,000 vehicles a year on behalf of a wide range of sellers such as insurance…
See this project step-by-step…
Construction Works Vanguard Construction were awarded the Contract by competitive Tender for the extensive Construction & Facility Upgrade works at Copart UK’s recently acquired 14.5…
See this project step-by-step…
Tool Station, Aston Cross, Birmingham The Scope of Works comprised the removal of the rear of the unit, including an internal mezzanine area and office…
See this project step-by-step…
This scope of work relates to a piece of land (3.87 acres) adjacent to and accessed by Copart’s existing facility at Sandy Beds. The work…
See this project step-by-step…
Vanguard were commissioned to a build new facility that would be an integral part of Scope Leasing’s future business plans.
See this project step-by-step…
Following a number of successfully completed contracts with our client, Vanguard were invited to the Sealife Centre in Weymouth tasked with a brief to bring the external aesthetics of the park in line with the corporate brand
See this project step-by-step…
Controlled environment Systematic mechanical Demolition of various existing structures throughout the 40 Acre Site. The removal of both non-hazardous & notifiable hazardous waste from Site…
See this project step-by-step…
The initial brief Complete new concrete slab works Excavating trenches for land drainage Duration of works 6 weeks Excavation to reduce levels prior to concreting…