Original Entrance/Exit façade to the Sealife Centre Experience

The existing Entrance/Exit façade to the Sealife Centre Experience

Pod 3 existing external finishes consisting of Shiplap cladding and a weathered mansard

Pod 2 existing external finishes consisting of Shiplap cladding and a weathered mansard

consisting of Shiplap cladding and a worn internal lobby. With storage at a premium, Vanguard were tasked to identify potential areas where storage could be maximised

Existing felt and Bitumen/Asphalt roofing to all flat areas and parapet upstand

All Pods were in urgent need of remedial works with 4 out of the 5 Pods leaking in water

Works have commenced to Pod 1 using a 4k/N fixed scaffolding for access and servicing of trades. Debris Netting and brick guards installed to ensure the H&S of all site personnel

Preperations are being made for the external render with the perimiter mansard being rebuilt with structural timberwork with the stripping of the existing roofing has commenced

Works have commenced on Pod 2 using a 4k/N fixed scaffolding for access and servicing of trades. Debris Netting and brick guards installed to ensure the H&S of all site personnel

Preperations are being made for the external render with the perimiter mansard being rebuilt with structural timberwork with the stripping of the existing roofing has commenced

Head Cloaking detail scratch coated awaiting top coat. All blockwork has been patched ready for rendering.

Installation of a Cefil synthetic membrane was used to achieve a fast, sustainable, durable, and environmentally friendly waterproofing solution

Blockwork infills 90% complete to create additional storage space and the perimiter mansard tiling in progress

Cement screed rendering ongoing in public areas

Ongoing joinery works

Completion of a Cefil synthetic membrane was used to achieve a fast, sustainable, durable, and environmentally friendly waterproofing solution

Works completed to roof areas prior to striking of scaffold

Works completed to roof areas prior to striking of scaffold

Completed POD

Works complete

Contract Completion
Following a number of successfully completed contracts with our client, Vanguard were invited to the Sealife Centre in Weymouth tasked with a brief to bring the external aesthetics of the park in line with the corporate brand and provide a water tight, low maintenance solution due to the area being exposed to one of the harshest climate’s in the UK.
Vanguard worked closely with the onsite operations and maintenance teams to ensure the brief was full and comprehensive to ensure all requirements were met within the brief. The client had also requested that during the construction works, all park areas were to remain open to the public with no disruption or degradation to the customer park satisfaction, Health and Safety or the attractions animals.