A crusher is used to convert the brick & block spoil from demolition works, to useful hardcore which will be used for other construction works within the site

Demolition works segregated and carried out, strictly in accordance with Health & Safety Guidelines

Existing agricultural steel framed building, systematically demolished using 360° Excavator

Stock piled rubble from demolition works is hoarded prior to crushing

Demolition of portal framed building

Roof removal completed

Dust suppression equipment during demolition works

360° Excavator loading spoil for crushing

Site segregation of dangerous working areas, strictly enforced and maintained
Systematic mechanical Demolition of various existing structures throughout the 40 Acre Site.
The removal of both non-hazardous & notifiable hazardous waste from Site in a controlled & regulated manner.
Removal of redundant electrical Sub-Station, Transformers, Switchgear , Overhead power pylons throughout the site & their safe disposal.