Freshly laid yard slabs blended & tied into levels of existing concrete yard

New reinforced concrete yard slab poured in hit & miss sections

Shuttered strip with road planings compacted prior to concrete pour

Bomag roller compacting road prior to concrete pour

360° Excavator used to shape existing yard prior to concrete works

Concrete slab completed prior to brush finish being applied

Reinforcement set within shuttering prior to concrete pour

Concrete levelled by beam float prior to finish being applied

Freshly laid concrete yard slab completed and under cure
The re-construction of the Existing Vehicle Wash Bay Facility to DOE Guidelines-with Heavy Duty mesh Grating over existing Steel frame & skimmer drain to discharge.
The Construction of a Bunded Area to DOE requirements for the Storage of Cars prior to de-contamination. Comprising the shaping & laying of over 4,000m² of Concrete slab with both in-situ & precast kerbing laid around the perimeter.